Chromatic and Diaz, T. Apandi (Ed.) (2003). Extreme Programming Pocket Guide. Sebastopol, CA: O’Reilly & Associates.
Goldratt, E.M. (2002). De zwakste schakel. Utrecht: Het Spectrum.
Kor, R. and Wijnen, G. (2002). 50 checklisten voor project- en programmamanagement. Deventer: Kluwer.
Kroll, P. and Kruchten, Ph. (2004). The Rational Unified Process Made Easy: A practitioner’s Guide to the RUP. Boston: Addison Wesley.
McConnell, S. (1996). Rapid Development: Taming Wild Software Schedules. Redmond, Washington: Microsoft Press.
Stapleton, J. (2002). DSDM Dynamic Systems Development Method: De methode in de praktijk. Schoonhoven: Academic Service.
Wijnen, G., Renes, W. and Storm, P. (2004). Projectmatig werken. Utrecht: Het Spectrum.
Internet sources
[i] Spolsky, J. (2000). Painless Functional Specifications – Part 1: Why Bother? Referred to 31 May, 2006 http://www.joelonsoftware.com/articles/fog0000000036.html
[ii] Why power your site with XP? (z.j.). Referred to 31 May, 2006 via http://www.XP.com/
[iii] Extreme Programming: A gentle introduction (Last modified February 17, 2006). Referred to 31 May, 2006 via http://www.extremeprogramming.org/
[iv] Spolsky, J. (2000). WhatTimeIsIt.com. Functional Specification. Referred to 31 May, 2006 via http://www.joelonsoftware.com/articles/WhatTimeIsIt.html
[v] Spolsky, J. (2002). Fire And Motion. Referred to 31 May 2006 via http://www.joelonsoftware.com/articles/fog0000000339.html
[vi] Pair Programming successes and failures (2001-2003). Referred to 31 May, 2006 via http://discuss.fogcreek.com/joelonsoftware/default.asp?cmd=show&ixPost=2058




